Free Delivery Over £50*

Polar Lite 2 Tent Pitching Instructions

The Polar Lite tunnel tents offer a high degree of strength and durability for severe environments and snow conditions. See the Polar Lite 2 tent pitching instructions below:

  1. Unpack and lay out the flysheet, with the black pole sleeves uppermost (the inner tent is already attached).
  2. Unpack the 3 poles. Carefully join each pole section together and slide through the 3 black pole sleeves. Each pole has 1 x dome end tip, 1 x normal end tip.
  3. Slide through pole sleeve with dome end tip first. The shortest alloy pole is at the back.
  4. Insert the other ends of each pole in the eyelets provided.
  5. Peg out the flysheet hem at each end, using the webbing loops provided
  6. Peg out the back of the inner tent.
  7. Peg out the guy ropes provided.

The Polar Lite 2 is provided with:

  • 3 x alloy poles
  • 20 x ‘v’ alloy angle pegs

The Polar Lite 2 is no longer available, we recommend the Starlite 2.

Polar Lite 2 Tent Pitching Video