Free Delivery Over £50*

Solar Horizon 2 – Pitching Instruction

1. Unpack the tent and lay out the inner with the orange hooks uppermost.

2. Carefully assemble the one-piece alloy pole, ensuring that all joints are fully connected. Ensure the short pole B-B crosses over the main pole.

3. Insert each pole-end from the main part of the pole into the corresponding silver eyelet on the inner tent corners–A.

4. Attach the orange pole clips from the inner tent onto the main pole.

5. Insert the cross-piece pole-ends into the silvereyelets located above each inner tent door–B.

6. Place the flysheet over the inner tent and secure it to the pole set by using the cross-pole protection pockets at B.

7. Attach the eyelets at the flysheet corners under the pole feet at the inner tent corners and adjust tension–A. To further secure the flysheet to the poleset, use the x4 velcro tapes on the underside of the flysheet to attach to the pole.

8. Peg out points–A with the x4 5.6g alloy pegs and use the x10 9g Terra Firma Mini pegs for all other points of the tent.

9. To use trekking poles for extra stability in windy conditions with the velcro straps provided: Use the velcro straps at B–B on the inner and attach to the handle of the trekking pole. Raise the height of the trekking pole until it offers the tent more stability. Please see the website for more details.

 

Solar Horizon 2 is supplied with:

x1 alloy pole set

x10 9g Terra Firma Mini Pegs

x4 5.6g Alloy pegs

WARNING: KEEP ALL FLAME AND HEAT SOURCES AWAY FROM THIS TENT FABRIC