Free Delivery Over £50*

Expedition Super Quasar Tent Pitching Instructions

Read the Expedition Super Quasar tent pitching instructions below:

  1. Lay out the inner tent.
  2. Connect the pole sections together taking care that all the joints are fully inserted (otherwise the poles can be damaged when you tension the tent).
  3. Push the two red poles through the sleeves in the lines A-B and C-D, see diagram below, making sure that at least 60cm of pole sticks out at points B and D.
  4. Push the two blue pre-curved poles through the sleeves in the lines E-F, and G-H, making sure that at least 60cm of pole sticks out at points F and G.
  5. Insert the pole-ends into the outer most eyelets at B and D. Walk round the tent and push the poles at A and C upwards, until it is possible to insert the pole-ends into the outer most eyelets. Insert the pole-ends into the eyelets at points E and G. Then go round to the other side and insert the pole ends at points F and H.
  6. Pull the flysheet over the tent and locate the eyelets under the pole-ends.
  7. Peg out the four corners of the inner tent ONLY.
  8. Finally, peg out all the elastics and guylines.

The Expedition Super Quasar tent is supplied with the following:

  • 4 x alloy poles
  • 18 x alloy pegs

Diagram

Expedition Super Quasar Tent Pitching Video