Free Delivery Over £50*

Ultra Quasar Tent Pitching Instructions

Read the Ultra Quasar tent pitching instructions below:

  1. Lay out the inner tent.
  2. Carefully assemble the 4 poles. Ensure all the joints are fully connected.
  3. Slide the blue poles through the blue-marked pole sleeves.
  4. Slide the red poles through the red marked pole sleeves.
  5. Matching the colour of the eyelet tape on the inner with the pole, insert a pole end into the outermost eyelet.
  6. Peg out inner tent.
  7. For Quasar ETC only – slide the extra red pole through the flysheet pole sleeve.
  8. Throw flysheet over the inner tent.
  9. Matching the colour of the eyelet tape on the hem of the flysheet with the pole, insert a pole-end into the outermost eyelet on each tape.
  10. Peg out flysheet.
  11. Remember to adjust the flysheet tension as conditions alter. (The flysheet will tighten in strong sunlight and slacken if it gets wet).

The Ultra Quasar is supplied with the following:

  • 4 Alloy poles
  • 22 Titanium pegs (Ultra Quasar)
  • 22 Alloy pegs (Quasar)
  • Quasar ETC:
  • 5 alloy poles
  • 26 alloy pegs

Ultra Quasar Tent Pitching Video